Pagina de inicio
/
Ingeniería
/
Prior to purchasing the supplies for a project, what document should the builder first prepare? bill of materials estimate of the linear footage estimate of the square footage wiring diagram of the facility

Problemas

Prior to purchasing the supplies for a project, what document should the builder first
prepare?
bill of materials
estimate of the linear footage
estimate of the square footage
wiring diagram of the facility

Prior to purchasing the supplies for a project, what document should the builder first prepare? bill of materials estimate of the linear footage estimate of the square footage wiring diagram of the facility

Solución

avatar
Santiagomaestro · Tutor durante 5 años
expert verifiedVerificación de expertos
4.2 (180 votos)

Responder

A

Explicar

## Step 1<br />The question is asking about the document that a builder should prepare before purchasing supplies for a project. The options provided are: bill of materials, estimate of the linear footage, estimate of the square footage, and wiring diagram of the facility.<br /><br />## Step 2<br />A bill of materials is a comprehensive list of all the materials required for a project. It includes the quantity of each material needed, which is crucial for budgeting and purchasing purposes.<br /><br />## Step 3<br />An estimate of the linear footage or square footage is a measure of the space required for a project. While this is important, it does not provide a detailed list of the materials needed.<br /><br />## Step 4<br />A wiring diagram of the facility is specific to electrical projects and does not provide a comprehensive list of all the materials needed for a project.<br /><br />## Step 5<br />Therefore, the builder should first prepare a bill of materials before purchasing supplies for a project. This document will provide a detailed list of all the materials needed, which is essential for budgeting and purchasing purposes.
Haz clic para calificar: