Problemas

1. Which subflooring panels creates the just rigid subflooring? a. Plywood a. Oriented strand board (OSB) c. Tongue-and-groove plywood d. 1times 6boards areas where termites are a pr metal shield should be installed __ problem, a a. ontop the sit footing 1. on top of the footing c. between the sill plate and rim joist d. under the bottom wall plate 2. downward deflection at the center live load. downwa exceed __ t the cente a live load, must not exceed a.Vasth of the span b. Yanth of the span c. Yaoth of the span d. Yisoth of the span 27. When laying out the sill for joist locations 16^circ OC the first measurement on the sill should be at __ a. 141/4'' b. 15% '' c. 16'' d. 151/4'' 28. Use special nails when fastening treated lumber, because treatment chemicals can cause ordinary fasteners to __ a. become brittle b. corrode c. stain the wood d. shrink 29. The first floor should not be framed before the foundation is backfilled to allow the foundation to flex. a. True b. False
Solución

Ivánprofessionell · Tutor durante 6 años

4.5 (308 votos)
Responder
1. Which subflooring panels create the most rigid subflooring?<br />c. Tongue-and-groove plywood<br /><br />22. In areas where termites are a problem, a metal shield should be installed:<br />a. on top of the sill footing<br /><br />23. Building codes specify that, with a live load, downward deflection at the center of a joist must not exceed:<br />b. 1/360th of the span<br /><br />27. When laying out the sill for joist locations 16" OC, the first measurement on the sill should be at:<br />d. 15 1/4"<br /><br />28. Use special nails when fastening treated lumber, because treatment chemicals can cause ordinary fasteners to:<br />b. corrode<br /><br />29. The first floor should not be framed before the foundation is backfilled to allow the foundation to flex.<br />a. True
Haz clic para calificar: