Item 1 Which of the following should be used to cut EMT? a) Pipe cutter b) Table saw c) Hacksaw d) Chop saw Confidence Level Confident Unsure Guessed Scoring Scale: 0 1 2 3 4 Item 2 The first step in reaming conduit is to __ . a) insert the reamer tip into the conduit b) secure the conduit in a pipe vise c) rotate the reamer d) smooth the edge with coarse sandpaper Confidence Level:Confident Unsure Guessed Scoring Scale: 01234 Item 3 2. Forming PVC in the field requires the use of a(n) __ a) hand bender b) hickey c) hot box d) offset bender

Problemas

Item 1
Which of the following should be used to cut
EMT?
a) Pipe cutter
b) Table saw
c) Hacksaw
d) Chop saw
Confidence Level Confident Unsure Guessed
Scoring Scale: 0 1 2 3 4
Item 2
The first step in reaming conduit is to __
.
a) insert the reamer tip into the conduit
b) secure the conduit in a pipe vise
c) rotate the reamer
d) smooth the edge with coarse sandpaper
Confidence Level:Confident Unsure
Guessed
Scoring Scale: 01234
Item 3
2. Forming PVC in the field requires the use of
a(n)
__
a) hand bender
b) hickey
c) hot box
d) offset bender

Item 1 Which of the following should be used to cut EMT? a) Pipe cutter b) Table saw c) Hacksaw d) Chop saw Confidence Level Confident Unsure Guessed Scoring Scale: 0 1 2 3 4 Item 2 The first step in reaming conduit is to __ . a) insert the reamer tip into the conduit b) secure the conduit in a pipe vise c) rotate the reamer d) smooth the edge with coarse sandpaper Confidence Level:Confident Unsure Guessed Scoring Scale: 01234 Item 3 2. Forming PVC in the field requires the use of a(n) __ a) hand bender b) hickey c) hot box d) offset bender

Solución

avatar
Edgarveterano · Tutor durante 11 años
expert verifiedVerificación de expertos
4.3 (181 votos)

Responder

Item 1: The correct answer is d) Chop saw. A chop saw is specifically designed to cut EMT (Electrical Metallic Tubing) efficiently and accurately.<br /><br />Item 2: The correct answer is b) secure the conduit in a pipe vise. The first step in reaming conduit is to secure it in a pipe vise to ensure stability and precision during the reaming process.<br /><br />Item 3: The correct answer is c) hot box. Forming PVC in the field requires the use of a hot box, which heats the PVC pipe to make it more pliable and easier to bend.