Pagina de inicio
/
Tecnología
/
Susan was asked to change the order of the slides in the presentation. How can she do this quickly? A Select Move Slide from the Format menu. B Right click the thumbnai and select Move. C Press SHIFT+UP ARROW to move the slide up one position. D Select the slide thumbnail and drag it to its new position.

Problemas

Susan was asked to change the order of the slides in the presentation. How can she do this quickly?
A	Select Move Slide from the Format menu.
B	Right click the thumbnai and select Move.
C	Press SHIFT+UP ARROW to move the slide up one position.
D	Select the slide thumbnail and drag it to its new position.

Susan was asked to change the order of the slides in the presentation. How can she do this quickly? A Select Move Slide from the Format menu. B Right click the thumbnai and select Move. C Press SHIFT+UP ARROW to move the slide up one position. D Select the slide thumbnail and drag it to its new position.

Solución

avatar
Silviaélite · Tutor durante 8 años
expert verifiedVerificación de expertos
4.6 (164 votos)

Responder

The correct answer is D. Select the slide thumbnail and drag it to its new position.<br /><br />To quickly change the order of slides in a presentation, Susan can select the slide thumbnail in the slide navigation pane or slide sorter view and drag it to its desired position. This allows her to easily rearrange the slides without having to manually navigate through the presentation.
Haz clic para calificar: