When testing for absence of voltage, what is the correct sequence?
Test the circuit once and proceed
Test the instrument on known voltage, test circuit , verify instrument on knowr voltage
Test the circuit twice
Visual inspection only

When testing for absence of voltage, what is the correct sequence? Test the circuit once and proceed Test the instrument on known voltage, test circuit , verify instrument on knowr voltage Test the circuit twice Visual inspection only

Solución

avatar
Nataliaprofessionell · Tutor durante 6 años
expert verifiedVerificación de expertos
4.4 (268 votos)

Responder

The correct sequence is:<br /><br />**Test the instrument on known voltage, test circuit, verify instrument on known voltage.**<br /><br />### Explanation:<br />This sequence ensures safety and accuracy when testing for the absence of voltage. Here's why:<br /><br />1. **Test the instrument on a known voltage source:** This step verifies that your testing device (e.g., multimeter or voltage tester) is functioning correctly before you use it on the circuit.<br /><br />2. **Test the circuit:** After confirming the instrument works, use it to check the circuit for the presence or absence of voltage.<br /><br />3. **Verify the instrument on a known voltage source again:** This final step ensures that the instrument did not fail during the process and confirms the reliability of your test results.<br /><br />This method is often referred to as the "live-dead-live" test and is a standard safety practice in electrical work to prevent accidents caused by faulty instruments or incorrect readings.