Ayuda para tareas de ingeniería
Diseñado para ingenieros estructurales de primera línea que trabajan en el campo, la ayuda de asignación de ingeniería espera ayudar a los ingenieros de todos los campos en su trabajo.
Contiene varias ayudas de cálculo, procesos de cálculo y métodos operativos que son efectivos en el trabajo diario del proceso de cálculo para producir datos rápidamente. Con funciones integrales de cálculo y consulta, los usuarios pueden buscar requisitos operativos relevantes de acuerdo con las necesidades reales y producir valiosos datos de ingeniería.
- Question 1 of 37 When projecting geometry from a body onto a sketch, which plane is the geometry projected onto? A. The active sketch plane B. The current viewpoint C. The face of the body being projected D. The Home view
- 1. Carbon dioxide __ (is or is not)effective on Class B and Class C fires. 2. Halogenated hydrocarbons are identified through a system of __ numbers. 3. Two typical inspection items for portable fire extinguishers are: a. __ b. __ 4. HRD extinguishing systems are discharged by an electrically ignited discharge cartridge called a __ 5. If an installed fire extinguishing system has been discharged by normal operation the __ (red or yellow) blowout disk will be ruptured. 6. Almost all type of fire extinguisher containers require __ to determine the amount of extinguishing agent. 7. Fire extinguisher containers must be hydrostatically tested every __ years. 8. If a discharge cartridge is removed from a discharge valve,it __ (may or may not)be used in another discharge valve assembly.
- Of the following which are the most common parts changed in a plasma torch? electrode and nozzle retaining cup and gas swirl ring electrode and workpiece clamp workpiece clamp and retaining cup
- Of the following which is sometimes equipped on some light-duty PAC equipment? water tank air compressor argon gas cylinder battery-operated power supply
- What should be clone after gas cylleders are disconnected from a plasma-are cutting unit before it is stored? replace the collnder caps lay all cylinders down on their side install a cap on the regulator cuttet set the regulator to Its maximum setting