Ayuda para tareas de ingeniería
Diseñado para ingenieros estructurales de primera línea que trabajan en el campo, la ayuda de asignación de ingeniería espera ayudar a los ingenieros de todos los campos en su trabajo.
Contiene varias ayudas de cálculo, procesos de cálculo y métodos operativos que son efectivos en el trabajo diario del proceso de cálculo para producir datos rápidamente. Con funciones integrales de cálculo y consulta, los usuarios pueden buscar requisitos operativos relevantes de acuerdo con las necesidades reales y producir valiosos datos de ingeniería.
- What does "dig" do when welding using the SMAW Process? It provides additional voltage when the arc voltage decreases It provides additional amperage when the arc voltage decreases It provides additional voltage regardless of arc voltage to assure a "driving" type arc It provides additional inductance when the current level drops
- Question #11 In which of the following situations would you use each of the three lane positions while driving? A. Position 1 for driving straight, Position 2 for passing, and Position 3 for making a turn. B. Position 1 for turning left, Position 2 for avoiding obstacles and Position 3 for passing. C. Position 1 for normal driving, Position 2 for making a left turn, and Position 3 for right turns. D. Position 1 for normal driving, Position 2 for preparing to pass and Position 3 for avoiding hazards or obstacles. 5 poin
- What are analogous structures? Structures that have the same function but different internal structures Structures that look the same/have the same internal structures Structures made out of the same material
- Which of the following descriptions of hybrid cars is correct? Hybrid cars do not use gasoline engines. Hybrid cars are energy-efficient. Hybrid cars have not been made yet. Hybrid cars rely on biomass fuel.
- 1. Which subflooring panels creates the just rigid subflooring? a. Plywood a. Oriented strand board (OSB) c. Tongue-and-groove plywood d. 1times 6boards areas where termites are a pr metal shield should be installed __ problem, a a. ontop the sit footing 1. on top of the footing c. between the sill plate and rim joist d. under the bottom wall plate 2. downward deflection at the center live load. downwa exceed __ t the cente a live load, must not exceed a.Vasth of the span b. Yanth of the span c. Yaoth of the span d. Yisoth of the span 27. When laying out the sill for joist locations 16^circ OC the first measurement on the sill should be at __ a. 141/4'' b. 15% '' c. 16'' d. 151/4'' 28. Use special nails when fastening treated lumber, because treatment chemicals can cause ordinary fasteners to __ a. become brittle b. corrode c. stain the wood d. shrink 29. The first floor should not be framed before the foundation is backfilled to allow the foundation to flex. a. True b. False